OHIO'S INDUSTRIAL CHILLER BUYER

Ohio chiller buyer

Sell a 200–300 Ton Chiller in Ohio

If you have a 200–300 ton chiller in Ohio, we can discuss buying the equipment as it sits. We consider chillers from 20 to 2,000+ tons, as well as all other tonnages and all refrigerants. There is no requirement to run or test the machine for an offer. We make cash offers, pay upfront before pickup, and coordinate local Ohio removal. The buyer covers the agreed disconnects, refrigerant recovery, crane and rigging as needed, loading, freight and hauling. The information below explains what to share and how to prepare for a practical purchase.

BUYING ONLY   /   SERVING ALL OF OHIO

Industrial chiller equipment
INDUSTRIAL EQUIPMENTOHIO   /   Chiller tonnage
Payments Upfront
No Testing
We Cover All Freight
All Tonnages Bought
Built for the heavy lifting

WE BUY IT.
WE HANDLE THE REST.

When it is time to move an industrial chiller, you need a buyer who understands the whole job—not just the equipment.

Tell us about your chiller
01

Buyer, not a seller

We buy industrial chillers across Ohio, with payment upfront and no testing required.

02

Every size, every refrigerant

All tonnages and refrigerants are considered, including chillers from 20 to 2,000+ tons.

03

Removal, handled

We arrange crane work, rigging, refrigerant recovery, disconnects, loading, hauling and all freight.

Industrial chiller in an equipment room
Large equipment is our business

20–2,000+

TONS   /   AND ALL TONNAGES

From air-cooled and water-cooled units to centrifugal, screw and scroll chillers, tell us what you have. We buy equipment in all sizes and with all refrigerants.

Text Nameplate Photos
THE DETAILSOHIO   /   Chiller tonnage

What to know about 200–300 Ton chillers

A 200–300 ton unit may be packaged for outdoor installation or installed as part of an indoor plant. Either way, the sale should identify included controls, drives and auxiliaries separately.

The 200–300 Ton category describes a cooling-capacity range rather than a guaranteed equipment weight or a fixed offer. We consider all tonnages, including units from 20 to 2,000+ tons and machines outside that range. Send the actual plate information so the machine can be identified.

Plan the pickup at your Ohio site

Ohio pickup planning starts at the exact equipment location, not just the mailing address. Show the machine in its room or on its pad, the intended exit, the route to a truck and any locked gates. Tell us who can approve access and whether nearby equipment needs to stay in service. A roof, basement and outdoor yard each present different handling questions.

Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.

Inventory multiple machines separately

Share a clear nameplate, known condition and the total cooling rating, plus separate photos of any detached cabinet included.

When a plant has several chillers, use the physical position or site asset number to match each wide photo to its own nameplate. List manufacturer, model, serial, capacity, voltage and refrigerant for each unit where known. Similar cabinets can conceal different equipment or service histories. Specify whether the offer should cover one machine, a selected group or all of the machines identified.

Condition is information, not a testing requirement

Describe visible damage, known faults or missing components, and indicate whether the equipment is connected or retired. We do not require a performance test.

A machine described as spare may be disconnected, or it may still be connected and held for backup. Clarify its current release status and when the site can make it available; do not start it just to establish its value.

We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.

Plan for water or process-fluid connections

The chiller may have water or process-fluid piping in addition to its refrigerant circuit. Tell the buyer which connections are still attached, whether fluid condition is known and what nearby equipment has to stay. The buyer coordinates and pays for agreed disconnects and refrigerant recovery. The site should identify the system boundaries; personnel doing the work determine the appropriate isolation and handling steps.

Check loading space and truck access

Identify the narrowest door and an available staging area. A professional rigging assessment should determine the lifting arrangement.

A suitable loading area requires more than a nearby door. Describe the gate, turning room, dock height, possible truck position and any other contractors using the area. The buyer handles and covers the agreed rigging, crane work if needed, loading, freight and hauling. Weight, load distribution and the route to the vehicle must be verified for the particular machine and property.

Coordinate a sale with a larger project

A replacement or shutdown may have several contractors working against different milestones. Tell us when the equipment can be released, who approves access and whether shared systems need to stay operational. We make a cash offer and pay upfront before pickup when accepted. Put the asset list and agreed buyer-paid removal work in writing so the chiller purchase is not confused with the entire plant project.

For multiple units, label each nameplate photo to match its location. Decide whether the sale includes all machines as a group or only the ones listed in the offer; nearby pumps and electrical gear are not automatically included.

What to send for a useful first conversation

Start with an asset list: manufacturer, model, serial, rated capacity, refrigerant and the location of each machine. Identify which units are surplus and whether they are still connected. Add photographs showing the room, pad or roof and the route toward a loading area. If the records are incomplete, mark unknown items rather than guessing or starting the machine.

For a 200–300 ton chiller in Ohio, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.

Does the owner need to hire a truck?

No. For the agreed purchase, the buyer covers loading, freight and hauling, as well as required disconnects, refrigerant recovery, rigging and crane work. The owner or site representative provides access and identifies the equipment to be sold.

A straightforward process

LET'S MAKE IT SIMPLE.

From your first photo to fast Ohio pickup, we make the heavy part our responsibility.

01 /

Share the details

Send the nameplate, location and any photos you have. A quick text works too.

02 /

Get a quote

We review your equipment and discuss an offer. No testing is required.

03 /

We handle removal

After the details are agreed, we arrange pickup, the equipment removal and freight.

Ready when you are

LET'S TALK CHILLERS.

Tell us what you have. We buy throughout Ohio, pay upfront and handle the heavy lifting.

Text Nameplate Photos
QUOTE REQUEST

Tell us about your equipment.

Fields marked * are required.

Images: up to 10 MB total. Have more photos? Text them to us instead.

Request a Quote