What to know about Multistack chillers
A Multistack installation can be modular. The sale might include an entire bank or only selected modules, so list the number of modules and be clear about the boundary between the equipment offered and the parts the building will keep.
The owner does not need to start or performance-test the chiller to request a purchase. Describe known defects, missing parts and how long it has been idle. Site and identification information are still needed so that equipment and removal can be evaluated accurately.
Plan the pickup at your Ohio site
Ohio pickup planning starts at the exact equipment location, not just the mailing address. Show the machine in its room or on its pad, the intended exit, the route to a truck and any locked gates. Tell us who can approve access and whether nearby equipment needs to stay in service. A roof, basement and outdoor yard each present different handling questions.
Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.
Compare the machine and its electrical gear
Photograph the system label and each accessible module label, noting individual serial numbers and the capacity shown for the assembly or modules.
Read the manufacturer, complete model and serial number from the chiller itself. Record rated cooling capacity, voltage, phase and the refrigerant on the unit plate if visible. A separate starter or variable-frequency drive can have its own label and may sit in another room. Photograph both and say whether the cabinet is included; a picture of a building automation panel alone does not identify the chiller.
Condition is information, not a testing requirement
Explain whether modules are intact, disconnected or missing. An unknown condition in one module should not be represented as the condition of every module.
A machine described as spare may be disconnected, or it may still be connected and held for backup. Clarify its current release status and when the site can make it available; do not start it just to establish its value.
We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.
Account for a closed or long-idled site
A former operator may not be present to explain the chiller’s status. Share the most recent records available and identify the person who controls the property and can authorize access to utility areas. The buyer coordinates and pays for the agreed disconnects and required refrigerant recovery. Unknown status should be treated as unknown, not as proof that the machine is empty or safe to cut.
Use drawings without treating them as a lift plan
Show how the modules are arranged and connected, the shared piping and the path to the exit; dismantling and load handling require a site-specific plan.
Existing dimensions, rigging drawings or documented weights can help frame the job, especially for a large central-plant unit. Tell us whether they describe the installed configuration or an earlier one. The buyer covers agreed rigging, crane if needed, loading, freight and hauling. The crew still verifies current obstacles, floor capacity, actual weight and lifting points before moving the equipment.
List a group of assets accurately
If you offer several chillers, identify each machine and whether the offer applies to the group or individual units. List separately located starters, drives or controls and state whether they are included. We make a cash offer and pay upfront before pickup after acceptance. The agreed purchase documents should describe what the buyer removes and the associated recovery, rigging and freight work.
Where records conflict, share both the installed equipment label and the inventory sheet. The buyer can resolve questions during review rather than assuming that a single old schedule describes the present machine.
What to send for a useful first conversation
Start with an asset list: manufacturer, model, serial, rated capacity, refrigerant and the location of each machine. Identify which units are surplus and whether they are still connected. Add photographs showing the room, pad or roof and the route toward a loading area. If the records are incomplete, mark unknown items rather than guessing or starting the machine.
For a chiller labeled Multistack to sell in Ohio, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.
What if the refrigerant is unknown?
Tell us the refrigerant is unknown and share any original or later labels you can safely photograph. We consider all refrigerants. The buyer coordinates required recovery with qualified personnel; the owner should not open a circuit or release refrigerant to identify it.