OHIO'S INDUSTRIAL CHILLER BUYER

Ohio chiller buyer

Sell a Chiller With Removal in Hocking County

If you have a surplus chiller needing removal in Hocking County, we can discuss buying the equipment as it sits. We consider chillers from 20 to 2,000+ tons, as well as all other tonnages and all refrigerants. There is no requirement to run or test the machine for an offer. We make cash offers, pay upfront before pickup, and coordinate local Ohio removal. The buyer covers the agreed disconnects, refrigerant recovery, crane and rigging as needed, loading, freight and hauling. The information below explains what to share and how to prepare for a practical purchase.

BUYING ONLY   /   SERVING ALL OF OHIO

Industrial chiller equipment
INDUSTRIAL EQUIPMENTOHIO   /   Chiller removal
Payments Upfront
No Testing
We Cover All Freight
All Tonnages Bought
Built for the heavy lifting

WE BUY IT.
WE HANDLE THE REST.

When it is time to move an industrial chiller, you need a buyer who understands the whole job—not just the equipment.

Tell us about your chiller
01

Buyer, not a seller

We buy industrial chillers across Ohio, with payment upfront and no testing required.

02

Every size, every refrigerant

All tonnages and refrigerants are considered, including chillers from 20 to 2,000+ tons.

03

Removal, handled

We arrange crane work, rigging, refrigerant recovery, disconnects, loading, hauling and all freight.

Industrial chiller in an equipment room
Large equipment is our business

20–2,000+

TONS   /   AND ALL TONNAGES

From air-cooled and water-cooled units to centrifugal, screw and scroll chillers, tell us what you have. We buy equipment in all sizes and with all refrigerants.

Text Nameplate Photos
THE DETAILSOHIO   /   Chiller removal

What to know about used industrial chillers

A surplus chiller can be a single packaged machine or part of a larger central cooling plant. The most useful starting point is not an estimate of scrap weight, but an inventory of the specific equipment offered and the practical route out of the building.

For removal in Hocking County, identify the point where the chiller can be released and the site contact who controls access. The sale includes buyer-paid removal for the agreed scope, so the owner does not need to arrange a truck or remove refrigerant before requesting an offer. The actual path and connections must still be reviewed for safety.

Plan the pickup at your Hocking County site

For pickup in Hocking County, provide the actual site address and service entrance, whether the equipment is in Logan, the county seat, or elsewhere in the county. The address alone does not show where a truck can stage or where the chiller exits. For equipment in a basement or enclosed plant room, describe stairs, ramps and possible removable panels. Never assume the original installation route is still available after later building modifications.

Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.

Reconcile original and later labels

Photograph the whole assembly and its manufacturer label, and note whether a starter, drive or control cabinet is attached or separate.

An old equipment schedule, an original nameplate and a later service tag may not all describe the same configuration. Photograph the unit label and any retrofit or conversion markings without removing covers. Supply the model, serial, capacity, voltage and stated refrigerant. If the documents disagree, share the conflict instead of choosing the answer that sounds most likely; the buyer can follow up on the actual equipment.

Condition is information, not a testing requirement

Equipment can be shut down, older, incomplete or of unknown operating status; explain what you know without restarting it.

A long idle period can leave the maintenance history incomplete. Give the last known status and distinguish what you observed from what an old record says. An unreadable label or an unknown fault is better described honestly than filled in with a guess.

We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.

Separate the chiller from live plant systems

The buyer coordinates and pays for the agreed disconnects and refrigerant recovery. Before the chiller is released, the facility representative should identify which water circuits, electrical feeds and controls serve other equipment. Qualified personnel plan isolation and recovery for the actual system. A machine that is not running can still contain refrigerant, fluid or stored electrical energy; do not cut, drain or vent it to obtain an offer.

Use drawings without treating them as a lift plan

For indoor equipment, identify the corridor, doorway and proposed loading area; for outdoor equipment, show the pad, fence and truck approach.

Existing dimensions, rigging drawings or documented weights can help frame the job, especially for a large central-plant unit. Tell us whether they describe the installed configuration or an earlier one. The buyer covers agreed rigging, crane if needed, loading, freight and hauling. The crew still verifies current obstacles, floor capacity, actual weight and lifting points before moving the equipment.

List a group of assets accurately

If you offer several chillers, identify each machine and whether the offer applies to the group or individual units. List separately located starters, drives or controls and state whether they are included. We make a cash offer and pay upfront before pickup after acceptance. The agreed purchase documents should describe what the buyer removes and the associated recovery, rigging and freight work.

For a closure, identify a primary contact who can provide access and answer questions after operations stop. Ask whether there are other contractors working in the same space or using the same loading area.

What to send for a useful first conversation

For a central plant, mark the chiller being offered in a wide photograph and identify the starter or drive if it is elsewhere. Provide the model, serial, tonnage and refrigerant if known. Describe connected systems that remain in service, the likely exit and the facility contact who can review isolation and access.

For a surplus chiller needing removal in Hocking County, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.

Does cooling tonnage equal equipment weight?

No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.

A straightforward process

LET'S MAKE IT SIMPLE.

From your first photo to fast Ohio pickup, we make the heavy part our responsibility.

01 /

Share the details

Send the nameplate, location and any photos you have. A quick text works too.

02 /

Get a quote

We review your equipment and discuss an offer. No testing is required.

03 /

We handle removal

After the details are agreed, we arrange pickup, the equipment removal and freight.

Ready when you are

LET'S TALK CHILLERS.

Tell us what you have. We buy throughout Ohio, pay upfront and handle the heavy lifting.

Text Nameplate Photos
QUOTE REQUEST

Tell us about your equipment.

Fields marked * are required.

Images: up to 10 MB total. Have more photos? Text them to us instead.

Request a Quote