OHIO'S INDUSTRIAL CHILLER BUYER

Ohio chiller buyer

Sell a Chiller With Removal in Allen County

If you have a surplus chiller needing removal in Allen County, we can discuss buying the equipment as it sits. We consider chillers from 20 to 2,000+ tons, as well as all other tonnages and all refrigerants. There is no requirement to run or test the machine for an offer. We make cash offers, pay upfront before pickup, and coordinate local Ohio removal. The buyer covers the agreed disconnects, refrigerant recovery, crane and rigging as needed, loading, freight and hauling. The information below explains what to share and how to prepare for a practical purchase.

BUYING ONLY   /   SERVING ALL OF OHIO

Industrial chiller equipment
INDUSTRIAL EQUIPMENTOHIO   /   Chiller removal
Payments Upfront
No Testing
We Cover All Freight
All Tonnages Bought
Built for the heavy lifting

WE BUY IT.
WE HANDLE THE REST.

When it is time to move an industrial chiller, you need a buyer who understands the whole job—not just the equipment.

Tell us about your chiller
01

Buyer, not a seller

We buy industrial chillers across Ohio, with payment upfront and no testing required.

02

Every size, every refrigerant

All tonnages and refrigerants are considered, including chillers from 20 to 2,000+ tons.

03

Removal, handled

We arrange crane work, rigging, refrigerant recovery, disconnects, loading, hauling and all freight.

Industrial chiller in an equipment room
Large equipment is our business

20–2,000+

TONS   /   AND ALL TONNAGES

From air-cooled and water-cooled units to centrifugal, screw and scroll chillers, tell us what you have. We buy equipment in all sizes and with all refrigerants.

Text Nameplate Photos
THE DETAILSOHIO   /   Chiller removal

What to know about used industrial chillers

A surplus chiller can be a single packaged machine or part of a larger central cooling plant. The most useful starting point is not an estimate of scrap weight, but an inventory of the specific equipment offered and the practical route out of the building.

For removal in Allen County, identify the point where the chiller can be released and the site contact who controls access. The sale includes buyer-paid removal for the agreed scope, so the owner does not need to arrange a truck or remove refrigerant before requesting an offer. The actual path and connections must still be reviewed for safety.

Plan the pickup at your Allen County site

For pickup in Allen County, provide the actual site address and service entrance, whether the equipment is in Lima, the county seat, or elsewhere in the county. The address alone does not show where a truck can stage or where the chiller exits. When a plant is closing, confirm the person who holds the keys and can approve site entry. List any other contractors using the same space so that access, isolation and equipment movement can be coordinated.

Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.

Inventory multiple machines separately

Photograph the whole assembly and its manufacturer label, and note whether a starter, drive or control cabinet is attached or separate.

When a plant has several chillers, use the physical position or site asset number to match each wide photo to its own nameplate. List manufacturer, model, serial, capacity, voltage and refrigerant for each unit where known. Similar cabinets can conceal different equipment or service histories. Specify whether the offer should cover one machine, a selected group or all of the machines identified.

Condition is information, not a testing requirement

Equipment can be shut down, older, incomplete or of unknown operating status; explain what you know without restarting it.

A machine described as spare may be disconnected, or it may still be connected and held for backup. Clarify its current release status and when the site can make it available; do not start it just to establish its value.

We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.

Identify the actual refrigerant safely

We consider all refrigerants and arrange qualified recovery when required as part of the agreed purchase. Photograph the original nameplate and any current conversion label, and pass along prior recovery records if available. A switched-off machine is not necessarily empty. Do not open a fitting or release refrigerant to check it. Appropriate personnel must assess the actual charge, circuit and applicable handling requirements.

Measure the path from room to truck

For indoor equipment, identify the corridor, doorway and proposed loading area; for outdoor equipment, show the pad, fence and truck approach.

The buyer covers agreed rigging, crane work if needed, loading, freight and hauling. Give the width and height of the narrowest opening, the distance to the loading point and any turns or changes of level. The chiller may have been installed before walls, cables or other equipment were added. A rigging crew verifies actual weight, lifting points and floor capacity; the owner should not try to move the machine for a quote.

List a group of assets accurately

If you offer several chillers, identify each machine and whether the offer applies to the group or individual units. List separately located starters, drives or controls and state whether they are included. We make a cash offer and pay upfront before pickup after acceptance. The agreed purchase documents should describe what the buyer removes and the associated recovery, rigging and freight work.

If the chiller is being replaced, tell us when it will actually be released and which plant services must remain live. A replacement schedule and a completed isolation are different things.

What to send for a useful first conversation

Send a wide picture of the entire chiller and a readable nameplate photo. Add the pickup address or city, the unit’s location in the building, and the name of the authorized equipment owner. Say whether controls or a separate starter are included and describe any known faults. A picture of the service exit helps the buyer understand how it may be removed.

For a surplus chiller needing removal in Allen County, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.

Does cooling tonnage equal equipment weight?

No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.

A straightforward process

LET'S MAKE IT SIMPLE.

From your first photo to fast Ohio pickup, we make the heavy part our responsibility.

01 /

Share the details

Send the nameplate, location and any photos you have. A quick text works too.

02 /

Get a quote

We review your equipment and discuss an offer. No testing is required.

03 /

We handle removal

After the details are agreed, we arrange pickup, the equipment removal and freight.

Ready when you are

LET'S TALK CHILLERS.

Tell us what you have. We buy throughout Ohio, pay upfront and handle the heavy lifting.

Text Nameplate Photos
QUOTE REQUEST

Tell us about your equipment.

Fields marked * are required.

Images: up to 10 MB total. Have more photos? Text them to us instead.

Request a Quote