OHIO'S INDUSTRIAL CHILLER BUYER

Ohio chiller buyer

Screw Chillers Wanted in Dayton, Ohio

If you have screw chillers in Dayton, we can discuss buying the equipment as it sits. We consider chillers from 20 to 2,000+ tons, as well as all other tonnages and all refrigerants. There is no requirement to run or test the machine for an offer. We make cash offers, pay upfront before pickup, and coordinate local Ohio removal. The buyer covers the agreed disconnects, refrigerant recovery, crane and rigging as needed, loading, freight and hauling. The information below explains what to share and how to prepare for a practical purchase.

BUYING ONLY   /   SERVING ALL OF OHIO

Industrial chiller equipment
INDUSTRIAL EQUIPMENTOHIO   /   Screw Chillers
Payments Upfront
No Testing
We Cover All Freight
All Tonnages Bought
Built for the heavy lifting

WE BUY IT.
WE HANDLE THE REST.

When it is time to move an industrial chiller, you need a buyer who understands the whole job—not just the equipment.

Tell us about your chiller
01

Buyer, not a seller

We buy industrial chillers across Ohio, with payment upfront and no testing required.

02

Every size, every refrigerant

All tonnages and refrigerants are considered, including chillers from 20 to 2,000+ tons.

03

Removal, handled

We arrange crane work, rigging, refrigerant recovery, disconnects, loading, hauling and all freight.

Industrial chiller in an equipment room
Large equipment is our business

20–2,000+

TONS   /   AND ALL TONNAGES

From air-cooled and water-cooled units to centrifugal, screw and scroll chillers, tell us what you have. We buy equipment in all sizes and with all refrigerants.

Text Nameplate Photos
THE DETAILSOHIO   /   Screw Chillers

What to know about screw chillers

A screw chiller uses a rotary screw compressor. It may be a packaged outdoor unit or an indoor machine in a larger water system, and a single chiller can have more than one compressor or refrigerant circuit. The actual configuration matters more than the compressor name alone.

For this Dayton purchase, describe the actual screw chillers offered and distinguish the unit from any shared equipment that remains on site. The offer can include a plan for the buyer to remove it, rather than asking the owner to deliver it or run a test.

Plan the pickup at your Dayton site

Dayton is in Montgomery County. For a Dayton-area chiller, tell us whether pickup is from an active campus, an industrial building or a property being vacated. A site plan that marks the mechanical room, service exit and possible truck position can clarify the work. Do not assume a loading dock is suitable without sharing its height and available clearance.

Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.

Inventory multiple machines separately

Photograph the complete machine, chiller and compressor labels, and the control panel. Specify whether the tonnage is for the whole unit or a single circuit.

When a plant has several chillers, use the physical position or site asset number to match each wide photo to its own nameplate. List manufacturer, model, serial, capacity, voltage and refrigerant for each unit where known. Similar cabinets can conceal different equipment or service histories. Specify whether the offer should cover one machine, a selected group or all of the machines identified.

Condition is information, not a testing requirement

A known fault on one circuit, missing electrical parts or a prior repair should be described as accurately as possible; do not energize equipment for the quote.

If a prior operator’s records cannot be located, provide the information currently visible and say what is unknown. We can discuss an offer without a performance demonstration, although the equipment and access still need to be identified.

We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.

Confirm electrical and controls boundaries

A chiller can have power and control connections in different places, including a separate starter or drive. Tell the buyer where those cabinets are and which building controls remain. The buyer covers the agreed disconnects and refrigerant recovery, using appropriately qualified personnel. Do not remove covers, disconnect wiring, reset controls or assume that a blank display means the system is electrically safe.

Plan for basement or interior equipment

Show the skid, connections and access around the compressor and vessels so the buyer can plan the disconnect and movement as a complete package or approved sections.

An interior machine may have to pass through a service corridor, opening, ramp or other constrained route. Photograph each transition and describe any surfaces or adjacent machinery that need protection. The buyer coordinates and pays for agreed rigging, crane work if needed, loading and freight. Qualified personnel determine whether a route is viable and whether any separation is appropriate for that specific machine.

Resolve uncertainty before pickup

An initial inquiry can start with imperfect information, but material uncertainty about ownership, equipment scope or access should be addressed in the agreed plan. Share conflicting records or missing details openly. We make a cash offer and pay upfront before pickup once an offer is accepted. Confirm the payment method, equipment and buyer-paid disconnect, recovery, rigging and transport scope in writing.

If a drive, starter or controller sits in another room, describe it separately and establish whether it is included. An offer is clearer when both the machine and its associated accessories are specifically listed.

What to send for a useful first conversation

If the equipment is outdoors or on a roof, show the whole machine, nameplate, perimeter clearance and an available truck or crane staging area. Provide the exact location and say whether fences, overhead obstacles or building restrictions affect access. Explain the known condition, included accessories and whether the unit remains connected.

For screw chillers in Dayton, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.

Does cooling tonnage equal equipment weight?

No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.

A straightforward process

LET'S MAKE IT SIMPLE.

From your first photo to fast Ohio pickup, we make the heavy part our responsibility.

01 /

Share the details

Send the nameplate, location and any photos you have. A quick text works too.

02 /

Get a quote

We review your equipment and discuss an offer. No testing is required.

03 /

We handle removal

After the details are agreed, we arrange pickup, the equipment removal and freight.

Ready when you are

LET'S TALK CHILLERS.

Tell us what you have. We buy throughout Ohio, pay upfront and handle the heavy lifting.

Text Nameplate Photos
QUOTE REQUEST

Tell us about your equipment.

Fields marked * are required.

Images: up to 10 MB total. Have more photos? Text them to us instead.

Request a Quote