What to know about water-cooled chillers
A water-cooled chiller uses a water-side system to reject heat. At a central plant, the chiller can be tied to both chilled-water and condenser-water piping, with pumps and a cooling tower elsewhere. A sale should specify which of these items are included and which remain with the building.
For this Columbus purchase, describe the actual water-cooled chillers offered and distinguish the unit from any shared equipment that remains on site. The offer can include a plan for the buyer to remove it, rather than asking the owner to deliver it or run a test.
Plan the pickup at your Columbus site
Columbus is in Franklin County. A Columbus pickup may involve an occupied commercial building, a secured data site, or a plant outside the central business area. Give the pickup address and loading entrance rather than just the city. If the machine shares a mechanical room with active equipment, mark the boundary of the unit to be removed and tell us which access doors can be opened.
Tell us about known site restrictions before scheduling. A site contact can explain what is accessible, but the removal team must evaluate the actual route, load and work area.
Inventory multiple machines separately
Photograph the chiller label, both ends of the vessels, control panel and visible water connections. Give the rated tons and refrigerant if listed.
When a plant has several chillers, use the physical position or site asset number to match each wide photo to its own nameplate. List manufacturer, model, serial, capacity, voltage and refrigerant for each unit where known. Similar cabinets can conceal different equipment or service histories. Specify whether the offer should cover one machine, a selected group or all of the machines identified.
Condition is information, not a testing requirement
Tell us if the machine is isolated, drained or still connected. Do not assume a water-cooled unit is empty because it is not running.
A machine described as spare may be disconnected, or it may still be connected and held for backup. Clarify its current release status and when the site can make it available; do not start it just to establish its value.
We consider used, surplus and non-running chillers, including equipment of unknown operating condition. There is no need to restore power, repair a fault or perform a performance test to ask for a cash offer. Accurate disclosure and a possible site access review are different from requiring the machine to operate.
Confirm electrical and controls boundaries
A chiller can have power and control connections in different places, including a separate starter or drive. Tell the buyer where those cabinets are and which building controls remain. The buyer covers the agreed disconnects and refrigerant recovery, using appropriately qualified personnel. Do not remove covers, disconnect wiring, reset controls or assume that a blank display means the system is electrically safe.
Protect equipment that stays behind
The removal plan must account for the two water circuits, any separate starter, room openings and the size and weight of each intended lift.
Mark the chiller to be sold and photograph nearby systems that must remain. The route may pass sensitive controls, an occupied area or active machinery. The buyer coordinates and covers agreed rigging, crane if needed, loading and freight; the site representative helps identify operating boundaries and access restrictions. Rigging professionals choose methods after assessing the equipment, lift points and building conditions.
Resolve uncertainty before pickup
An initial inquiry can start with imperfect information, but material uncertainty about ownership, equipment scope or access should be addressed in the agreed plan. Share conflicting records or missing details openly. We make a cash offer and pay upfront before pickup once an offer is accepted. Confirm the payment method, equipment and buyer-paid disconnect, recovery, rigging and transport scope in writing.
If the building owner and equipment owner are different, confirm who can approve the sale and who controls the building. The machine cannot be released merely because a contractor or tenant knows it is unused.
What to send for a useful first conversation
If the equipment is outdoors or on a roof, show the whole machine, nameplate, perimeter clearance and an available truck or crane staging area. Provide the exact location and say whether fences, overhead obstacles or building restrictions affect access. Explain the known condition, included accessories and whether the unit remains connected.
For water-cooled chillers in Columbus, include the location and a contact who can confirm the asset and arrange site access. If a detail is unavailable, say so instead of taking an unsafe photograph or guessing at the specifications.
Does cooling tonnage equal equipment weight?
No. Cooling tons measure capacity, not the weight of the assembly. We consider all tonnages, including 20 to 2,000+ tons. A removal crew needs the actual dimensions and verified weight, not an estimate based on the capacity label.